3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

Product Details
Customization: Available
After-sales Service: Available
Warranty: 24 Months
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (17)
  • 3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
  • 3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
  • 3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
  • 3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
  • 3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
  • 3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
Find Similar Products
  • Overview
  • Investment Profit
  • Product Description
  • Latest XINMAO News
  • Company Profile
  • Factory Display
  • FAQ
Overview

Basic Info.

Type
Water Filling Machine
Automatic Grade
Automatic
Material Type
Liquid
Filling Valve Head
8
Feed Cylinder Structure
Multi-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Model No.
Cgf
Material
SUS304 / 316L
Bottle Volume
200ml - 2L
Capacity
1000bph - 24000bph
Function
Rinsing Filling Capping
Control
PLC (Siemens)
Keywords
Water Bottling Machine
Filling Product
Pure Water / Mineral Water
Bottle Material
Pet Bottle / Glass Bottle
Voltage
Customized
Certification
CE, ISO, SGS
Transport Package
Wooden Case
Specification
170*220*220
Trademark
XINMAO
Origin
Zhangjiagang City, Jiangsu Province, China
HS Code
8422301090
Production Capacity
1000bph - 24000bph

Product Description

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

Investment Profit

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

Product Description

1. Water Treatment System
According to customer's raw water analysis report and the final water standard request, we will suggest customer to choose the suitable water treatment system.

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water2. Automatic PET Bottle Blow Molding Machine
Bottle blowing machine is to make plastic bottles for mineral/pure water, carbonated drink, juice and so on. It is widely used in the food and beverage package industry.

Capacity range: 1,000-20,000PCS/H
Applicable bottle size: Within 2L
Applicable bottle material: PET
Product can be filled: Mineral water, pure water, carbonated drink, soft drink, soda water, etc.
Applicable bottle design: Various kinds of bottle design, customized according to user's request.
Automation degree: Fully automatic
Advantages of this machine that you may concern about:
(1) High production rate
(2) Labor saving
(3) Energy saving
(4) Realize direct connection from blowing to filling
(5) Low failure rate

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
3. CGF Wash-filling-capping 3-in-1 Product introduction:
This CGF Wash-filling-capping 3-in-1 unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water,alcoholic beverage machinery and other non-gas beverage machinery. Beverage Machinery can finish all the process such as washing bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.The Complete Bottled Mineral Water / Pure Water Production Line used in the beverage filling operations.
Model: CGF series rotary type
Capacity range: 1,000-25,000PCS/H
Applicable bottle size: Within 2L
Applicable bottle material: Plastic bottle
Filling method: Normal pressure filling/ Gravity filling
Product can be filled: Water, non-carbonated drink, etc.
Automation degree: Fully automatic
Electricity control system: Germany Siemens PLC
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

Rinser:

  1. The rotary wheel is a fully stainless steel welded structure.
  2. The machine applies unique overturning bottle clamp, which is an innovation of our company. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable.
  3. The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water.
  4. All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing.
  5. The rinser is driven by driving system positioned inside machine frame via gear transmission.
  6. Transfer starwheel
  7. Made of stainless steel of superior quality.
  8. Equipped with bottle jam protection device.
Filler:
  1. Rotary wheel fully made of stainless steel SUS 304.
  2. Gravity filling method.
  3. Filling valves are made of SUS316L.
  4. Filling valves are reasonably structured with accurate filling.
  5. Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
  6. Level of cylinder is controlled with float-ball.
  7. Filler is driven through gears inside the machine frame.
  8. Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck.
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
Capper:
Capper is the machine with highest precision, influence very much with the stability and reliability of the filling monoblock. Our capper features as follows:
The equipment is designed and used the technology of Arol from Italy, most advance technology in the world, developed with the experience of asepsis filling machine. For example, I) extruding wheel (main part to control the stability when sealing), uses the technology of Arol. Kinematical and kinetic design of the wheel by experts improves the stability and credibility of the equipment. II) Sealing faucet (main part to control the credibility of sealing), is improved by experts with the design of alnico. Besides the magnetic contortion variation device, there is variation dial which makes variation more easily. The benefit of this design is not only it can set the contortion, but also it makes contortion more precise and credible, and reduces inferior.
Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism.
Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute.
The capper is equipped with inlet bottle detection switch.
Centrifugal way of cap arranging is adopted to reduce damage of caps.
A cap inspecting system is applied to control on-off of elevator.

 
Products Parameters:
We supply complete solution for the pure drinking mineral water PET bottle filling plant. Including: Water Filtration treatmentsystem/PET Bottle Washing filling capping machine/Code sprayer /Automatic labeling machine/ Automatic packing machine / Automatic Palletizer system/ Automatic film wrapping machine and son on.
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

                 Within 2L Bottle Sizes                                        3L & 15L Bottle Sizes                                      3Gallon to 5Gallon Bottle sizes

Model Output/Capacity Power Size Weight
CGF8-8-3 2000-3000BPH 3KW 1750*1400*2250 MM 2500KG
CGF14-12-5 3000-4000BPH 5KW 2200*1560*2300 MM 3000KG
CGF18-18-6 5000-6000BPH 5KW 2250*1670*2300 MM 3500KG
CGF24-24-8 8000-10000BPH 6KW 2800*1800*2300 MM 5000KG
CGF32-32-10 12000-15000BPH 8KW 4300*3500*2300 MM 7000KG
CGF40-40-12 15000-18000BPH 12KW 4600*3800*2300 MM 10000KG
CGF50-50-12 18000-22000BPH 15KW 5000*4200*2300 MM 12000KG
CGF60-60-15 20000-25000BPH 18KW 5500*4500*2300 MM 15000KG

4.Labeling Machine
There are mainly three kinds labeling machine, PVC sleeve shrink labeling machine, self adhesive labeling machine and OPP hot glue labeling machine.
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
5.Laser Machine:
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water
6. Packaging Machine
There are mainly two kinds of case packing machines, film shrink wrapping machine and carton packing machine. For film shrink wrapping machine, there is also with for unprinted film and for printed film, then there is also shrink film with carton tray. For carton packing machine, there is tape sealing type and hot glue sealing type.
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

Layout Drawings Design (CAD )For Turnkey Solution
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

1.Automatic PET Bottle Blow Molding Machine 2.Washing Filling Capping Machine 3.Cap elevator 4.Code sprayer 5.Conveyor System 6.Automatic labeling Machine 7. Auotmatic PE film shrink wrapping machine
3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

Latest XINMAO News

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

Company Profile

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

ZHANGJIAGANG CITY XINMAO DRINK MACHINERY CO., LTD

We are a professional manufacturing and trading Combo, who is specializing in the research, development and production of various water and beverage machinery. XINMAO has standard workshop more than 6000 square meters, and more than 18 years of technical and practical experience in helping customers set up water and beverage production lines in their factory.

Factory Display

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

3 in 1 Full Automatic Production Plant Line Bottle Washing Capping Packing for Mineral Pure Water

FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 15 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

 

 

                                                                                   
                                                                                                      

 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier