Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

Product Details
Customization: Available
After-sales Service: Available
Warranty: 24 Months
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (17)
  • Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
  • Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
  • Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
  • Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
  • Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
  • Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
Find Similar Products
  • Overview
  • Product Description
  • Machine Details
  • Product Parameters
  • Latest XINMAO News
  • Company Profile
  • Factory Display
  • FAQ
Overview

Basic Info.

Automatic Grade
Automatic
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Multi-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Model No.
Rcgf
Material
SUS304 / 316L
Bottle Volume
200ml - 2L
Capacity
1000bph - 24000bph
Function
Rinsing Filling Capping
Control
PLC (Siemens)
Keywords
Water Bottling Machine
Filling Product
Pure Water / Mineral Water
Bottle Material
Pet Bottle / Glass Bottle
Voltage
Customized
Certification
CE, ISO, SGS
Transport Package
Wooden Case
Specification
170*220*220
Trademark
XINMAO
Origin
Zhangjiagang City, Jiangsu Province, China
HS Code
8422301090
Production Capacity
1000bph - 24000bph

Product Description


Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

Product Description

Fruit Juice / Tea Drinks Bottle Filling Machine

*XINMAO supplys complete solution for the juice , tea drinks , energy drinks filling production line ,including Water treatment system / Syrup melting system / Blending & mixing system / Homogenizer & sterilizer system / HFSC storage system / indegredient dosing system / Washing filling capping machine / Code sprayer / Pasteurizer tunnel / Automatic labeling machine / Automatic packing machine / Automatic Palletizer system and so on.

XINMAO Automatic Glass Bottle Juice Washing Filling Capping Machine
This machine is specially designed for the filling of juice / Tea drinks / Energy Drinks / Milk Beverage in PET bottle and glass bottles ,it is an integrated equipment for bottle washing ,filling and capping function.
Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
                     PET Plastic Bottle                                  Aluminu Can / Tin Can                                              Glass Bottle  

Machine Details

Raw fruit Juice processing

1.Surf washer
 

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

2.Beater

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

3.Colloid Mill

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

4.Horizontal Centrifuge

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

5.Mixing Tank

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

6.Duplex Filter

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
7.High Pressure Homogenizer
 

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

8.Temporary Storage Tank

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
9.Vacuum Degasser

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

10.Finished Insulation Tank

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

11.Washing Part

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

12.Filling Part

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant
13.Capping Part

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

Product Parameters

Model
Output/Capacity
Filling accuracy
Size
Weight
RCGF8-8-3
2000BPH
 
 
 
 
 
 
≤±5mm
2000*1550*2250 MM
2500KG
RCGF14-12-5
3000-4000BPH
2180*1560*2300 MM
3000KG
RCGF18-18-6
5000-6000BPH
2350*1900*2300 MM
3500KG
RCGF24-24-8
8000-10000BPH
2900*2000*2300 MM
5000KG
RCGF32-32-10
12000-15000BPH
3500*2850*2300 MM
7000KG
RCGF40-40-12
15000-18000BPH
4500*3750*2300 MM
10000KG
RCGF50-50-12
18000-22000BPH
5200*4000*2300 MM
12000KG
RCGF60-60-15
20000-25000BPH
5500*4500*2300 MM
15000KG

Latest XINMAO News

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line PlantEnergy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

Company Profile

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

About XINMAO MACHINERY

Zhangjiagang City Xinmao Drink Machinery Co.,Ltd. founded at 2005.Itd is located at Jinfeng Economic Development Zone Of Zhangjiagang City. The company has more than 17 years of production practice experience and absorbs advanced technology at home and abroad. Our company is a professional manufacturer integrating research,development,and production of various water ,juice,soda,and can beverage machinery.We are a leading enterprise in research and production of beverage filling and packing machines. we also supply turnkey project according to customers' request, including workshop design, machine layout design, water, gas, electic cable layout design, label and bottle design.
 

Factory Display

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line PlantEnergy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant


Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

 

Energy Drinks Completed Fruit Juices Making Beverage Bottling Filling Machine Production Line Plant

 

 

FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 15 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.

Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.

Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.

 



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier